South-East Europe

Connections

 

Antwerp Combinant

 ↔Budapest Csepel / Vienna / Ploiesti / Halkali / Stara Zagora / Pancevo

Duisburg DIT

Budapest Csepel / Vienna / Ploiesti / Halkali / Stara Zagora / Pancevo

Geleen

Vienna WienCont / Ploiesti / Halkali / Stara Zagora / Pancevo

Ludwigshafen KTL

Budapest Csepel / Vienna / Ploiesti / Halkali / Stara Zagora / Pancevo

Rotterdam CLdN

Budapest Csepel / Vienna / Ploiesti / Halkali / Stara Zagora / Pancevo

Rotterdam Botlek

Budapest Csepel / Vienna / Ploiesti / Halkali / Stara Zagora / Pancevo

Vienna WienCont

Budapest Csepel / Ploiesti / Halkali / Stara Zagora / Pancevo

Zeebrugge

Budapest Csepel / Vienna / Ploiesti / Halkali / Stara Zagora / Pancevo

Team
4-meter-corridor via Gottard axis

Statement on consultation

In a nutshell


1. Corridor of 4 meters - necessary measure for Alptransit
2. Interoperability on international corridor
3. 4-meter-profile has immediate impact on modal shift
4. The line of Chiasso is more important, the line of Luino is more urgent
5. Corridor performance - a prerequisite for the degression of subsidies

 

Conclusion: Investing in a powerful freight corridor soon pays for itselves. It allows to reduce operating subsidies (about 150 million per year). But it works out only if both the Chiasso and the Luino line is equipped with the 4-meter profile. The parameters for an efficient rail freight - 750 meter train length, train weight 2000 tons with a single locomotive, profile P400 - must be implemented corridor-wide for all Swiss transit routes, including Chiasso, Luino and Lötschberg / Simplon.



See statement in German language

Get a quote

Contact

Denitsa
Nikolova
Deputy Director East Europe
Hupac Intermodal SA
Viale R. Manzoni 6
CH-6830 Chiasso
+41 58 8558122
dnikolova@hupac.com

Single point of contact

see@hupac.com